Thursday, 22 May 2008

Setting up

Day 1

8:00 am : We have arranged to meet at the front
side of the Museum of Subaquatic Archaeology with the engineer from the Harbour Authority who will help with the sea containers - When I arrived at the site, Rosa was already there chatting with the guy who operates the crane - eventually the trucks appeared from behind the building...



It was very bright already and we started preparing everything for the setting up - Angel will directed the crane's staff to gently locate the first sea container - He asked me where the longest container would go and I said that the door should face West. The idea was to set two sea containers facing each other; one was of 12 meters long and the other 6 meters.



11:30 am : The technicians from the council came to start installing power inside the sea containers. We worked out the best way to install power without leaving the wires too visible. Eventually we decided to buried them under the sand.